Manufacturer of Bromine Compounds
 
cardkem@narmada.net.in amit@cardkem.com aniket@cardkem.com
Location
The manufacturing facilities are located in western India, in the state of Gujarat, located 350 KM north of Mumbai, on National highway - 8 connecting Mumbai to the capital of India- New Delhi. It is about 10 KM south of Bharuch railway station and about 80 KM south of Vadodara, the nearest airport.
Plant
At a site spanning about 10000 sqm, three existing plants that are currently being restructured and upgraded, and four additional plants, that are in different stages of completion would provide a complement of  one pilot plant, three dedicated plants and three that would be of  multipurpose configurations suitable for manufacture of various groups of products.
The  facilities have about 25000 ltrs of  glass lined reactor  capacity and 75000 ltrs of SS reactor capacity - installed and under installation, and consist of typical configurations common to such industry. The plants are being engineered thru reputed and experienced engineering consultants to cater to the critical process requirements, and safety of plant, personnel and product.
Adequate supporting utilities in terms of gas fired steam boilers, thermopac boiler, cooling towers, refrigeration – brine / chilled water, vacuum / high vacuum, and captive power generation sufficing standby / emergency requirements have been provided. This would enable maintenance of defined process parameters critical to product quality.
Our engineering personnel, including the trained technicians provide break down, preventive and corrective maintenance. Critical systems are covered with annual maintenance contracts with service agencies to periodically monitor the performance. Instruments are covered by a calibration plan with established traceability and adequate records are maintained. We also focus on continual improvements in energy–fuel/ resource conservation. 
As a commitment towards quality, we are ISO 9001:2008 QMS company also actively pursuing and upgrading our systems and facilities towards simultaneously achieving ISO 14000 by end of the year.